De-inventing the wheel: Liquidated damages, penalties and the Indian contract act, 1872

Swaminathan, Shivprasad (2018) De-inventing the wheel: Liquidated damages, penalties and the Indian contract act, 1872. Chinese Journal of Comparative Law, 6 (1). pp. 103-127. ISSN 20504802

[thumbnail of CJCL2018.pdf] Text
CJCL2018.pdf - Published Version
Restricted to Repository staff only

Download (254kB) | Request a copy

Abstract

The drafters of the Indian Contract Act, 1872 had boldly sought to dispense with the English law’s troublesome liquidated damages-penalty dichotomy by providing in Section 74 that sums stipulated in the contract were to be awarded notwithstanding any proof of ‘actual damage or loss’, and, as a safety valve, empowered courts to scale down the sum. The drafters astutely avoided any reference to ‘liquidated damages’ or ‘penalties’ by employing the neologism ‘sum named in the contract’. Fast-forward by a century and a half, however, and one finds a double dissonance between the drafters’ blueprint and the law. First, the liquidated damages^penalty distinction has now become firmly entrenched in Indian law without any real scholarly or judicial resistance. Second, ‘reasonable compensation’ is now confined to compensation for damage or loss. The article hypothesizes that much of this is attributable to an ambiguity unwittingly introduced by theçuniversally overlookedç1899 amendment to section 74, the chief architect of which was the ace draftsman and treatise writer Mackenzie Chalmers. The amendment had meant to ‘slightly extend’ section 74 so as to cover some hit herto unregulated casesçnamely, increased interest stipulations, acceleration clauses, and payments in specieçbut did so by using the poorly chosen phrase ‘or:::any other stipulation by way of penalty’ to convey this extension. This drafting slip-up was to become the Trojan horse that let in the English law’s notion of ‘penalty’ and along with it, came tethered, the notion of ‘liquidated damages’.

Item Type: Article
Keywords: Indian contract act | Liquidated damages-penalty | Contract
Subjects: Social Sciences and humanities > Social Sciences > Law and Legal Studies
JGU School/Centre: Jindal Global Law School
Depositing User: Mr Sombir Dahiya
Date Deposited: 17 Dec 2021 07:25
Last Modified: 13 Jan 2022 03:38
Official URL: https://doi.org/10.1093/cjcl/cxy001
URI: https://pure.jgu.edu.in/id/eprint/248

Downloads

Downloads per month over past year

Actions (login required)

View Item
View Item